Empereur

Team building 2024 !

25/09/2024

The whole T4M team went to Dock 79 for its annual team building event! The day’s program included padel, water-skiing and tree-climbing. A beautiful sunny day that strengthened the bonds of the team.

Heating system renovation at Aqualibi

25/09/2024

T4M designed the new heating system for Aqualibi theme park. The work was carried out in 2023 and 2024, with the installation of new boilers and a heat pump, for a total output of 4.4MW. The pool and ventilation units heating distribution systems were also renovated.

Installation of a 400 kW cooling machine

17/05/2022

Renovation of the cold production in an office building in the European district

IMG_9145

Renovation of the boiler room of an apartment building

19/11/2020

Complete renovation of the boiler room (2 x 136 kW) of a 20-apartment building with domestic hot water production.

IMG-9668

Renovation of the boiler room of the ACP White Atrium

24/05/2019

Renovation of the boiler room of an office building with 3 condensing gas boilers of 450kW

DSCN2366[1]

CO2 emissions compensated !

30/12/2018

Following the planting of 8,000 trees in Madagascar, through the NGO Graine de vie, T4M compensates his 40 tons of CO2 emissions for the year 2018.

These emissions were assessed during his carbon assessment by the CO2 strategy company.

 

 

les plus grandes pépinières

Placement of a recuperation for 30,000 m³/h

4/12/2018

The placement of the recovery wheel and the cladding follows its course at the Emperor. The recovery wheel will allow a flow exchange on 30,000 m³/h of air!

Empereur-récupération

Updating EPB requirements

19/10/2018

Following the new Government Decree of 21 June 2018 on EPB requirements, some changes will apply as from 1 January 2019. T4M is at your disposal to guide you through these new guidelines.

However, here are some changes about existing heating system installations.

  • Gas water heaters are now part of the EPB regulation. They must therefore be controlled in the same way as heating systems.
  • A device that allows air to be replaced by outside air is mandatory.
  • A list of boilers and water heaters connected to a collective flue gas evacuation system must be established.
  • The meters relating to the ventilation units must be read annually

You will find the complete Order by clicking here

 

fond-blanc

Completed projects

28/03/2018

Three ACPs have put their faith in T4M. The work is complete and the boiler rooms are up and running.

Etude et realisation

New website

27/03/2018

T4M has updated its website!

New website

By continuing your navigation, you accept the deposit of third-party cookies to provide you with videos or sharing buttons and to establish statistics to improve this site.

Accept Decline More info